Olphert Avenue Siteworks – June 2016
With steel curved in two directions this installation in Vaucluse was a challenge for Jakin construction. However careful planning and co-ordination between architect, builder, fabricator and engineer meant the frame was erected in less than a day – with no site cuts required.