Whale Beach Siteworks – July 2013

Yuncken Construction are well underway with excavation for our project for a large new dwelling at Whale Beach. With a 50% slope on the site each of the levels need to be excavated and shored before excavating the level below. Excavation is scheduled to be completed by the end of July 2013, at which point construction work on the new dwelling can begin, with completion due for December 2014.

Monday 07.08.13
Posted by Nick Bell
 

Blandford Siteworks – May 2013

Work started on restoring and extending this Art Deco heritage item in beachside Bronte back in November 2003. The front heritage façade is to be retained largely in tact converting 3 apartments back to a single residence required substantial remodeling of the rear. Early demolition photos give a new meaning to the term “post-war architecture”. With stone benchtops installed and stairs now being fitted the project is on schedule for completion by June.

Wednesday 05.08.13
Posted by Nick Bell
 